Design the entire project from 60%
Trade-waste drainage including 7 pump stations
Sewer drainage including 1 pump station and 2 ATU’s
Water treatment plant installation
Waste water treatment plant installation
350m of Auspress stainless steel channel drain installed
4442m of in ground pipework installed
2178m of above ground pipework installed